Untitled Document


Agenda / Item Action Needed Remarks
Land/ Property owned/ leased by Area (in HA) 8419.63
Ownership/ Lease document available (to be verified & submitted) (in HA) 8409.82
Ownership/ lease document which are not available. (in HA) 9.81
Land/ Property which is not under utilization 6428.49 Unutilized Land in JOCP=90.35, Kedla OCP =884.43, Kedla Washery =465.28, KBP OCP = 1162.87, Parej East OCP=421.06, Parej West OCP= 715.76 Laiyo UGP= 612.30, Tapin North OCP= 192.56, Tapin South OCP=1883.88. (Area in Ha).
Action Plan for the utilization of the above PR for Parej West OCP, Gose OCP, Kedla OCP and Kedla Dania Railway Line is under preparation.. PR of Kotre Basantpur Pachmo OCP and Basantpur Tapin Coking Coal Washery has been approved and Land possession is under process.
Land & Property under encroachment 0.41
Action Plan for removal of encroachment Notice has been served to the Encroachers.


Annexure 1

Unit Name Unitwise Details of Land
owned/leased by Area (in Ha)
Availability of ownership/ lease document (in Ha) Verified by HOD/GM Utilization Status If unutilized, action plan for utilization
CHAINPUR SIDING 2.079 0 Yes Yes Occupied area at Sarubera Siding as per joint survey committee report of railway official & Kedla Washery Official found 2.079 Ha. Land is acquired by railway and possession under CCL on basis of payment of rent. As per Railway 2.5 Ha land is under utilization against Chainpur Siding.
CHARHI SIDING 0 0 No No Charhi Good shed is being managed by Indian Railways. Copy of lease/ agreement is not available.
GM OFFICE HAZARIBAGH 14.19 6.46 Yes Yes Land measuring 17.43 acre has been acquired under LA Act.1894, Out of 17.43 acre ownership document of land measuring 15.88 acre is available but ownership document of remaining land measuring 1.55 acre is not available at the area office, Land measuring 17.61 acre GM land has been transferred from state govt to CCL, but the related ownership document is not available at the area office. All above lands are under possession.
JHARKHAND COLLIERY 568.62 568.62 Yes Yes As per PR land required is 478.27 Ha including R&R site 10 Ha. + 7.85 Ha conveyor corridor, but as per lease hold excluding R&R site and conveyor corridor is 460.42 Ha.
KEDLA OCP 1073.48 1073.48 Yes Yes Mine Plan of area measuring 189.05 Ha has been prepared and PR for Kedla OCP of total area is under preparation.
KEDLA UGP 311.82 311.82 Yes Yes Area under approved PR of Kedla UGP is 333.50 Ha. EC & FC is under process. Area measuring 21.68 Ha is overlapping with leasehold of Jharkhand Colliery.
KEDLA WAHERY 489.97 489.97 Yes Yes Land under approved PR boundary of Kedla Washery is 24.69 Ha. Basantpur Tapin Coking Coal Washery & Kedla Dania Railway Siding is to be constructed in outside of the PR boundary of Kedla Washery..
Kotre Basantpur Pachmo Coal Mine 1162.87 1162.87 Yes No Area under approved PR of KBP OCP is 1162.87 Ha. EC & FC is under process.
LAIYO COLLIERY 612.30 612.30 Yes No Land has been acquired under CBA Act, 1957. Presently discontinued in the year 2005.Part Area of acquired land io be utilised under Jharkhand Laiyo PR.
PAREJ EAST UG 0 0 Yes Yes Total land under Parej East UGP is 393.36 Ha. In which, 390.89 Ha land is common with Parej East OCP and 2.47 Ha land is common with Parej West OCP.
PAREJ EAST OCP 820.06 820.06 Yes Yes As per PR land required is 399.00 Ha, but leasehold area under Parej East OCP, Hazaribagh Area, CCL.
PAREJ EAST UG 0 0 No Yes Repeated
PAREJ OCP 715.76 715.76 Yes No Land details has been given for Parej West OCP, PR of Parej West OCP is under preparation at CMPDIL.
REGIOANL STORE PAREJ 2.14 2.14 Yes Yes Presently under utilisation.
REGIONAL JUBILEE HOSPITAL, KEDLA 0.75 0.75 Yes Yes Presently under utilisation.
REGIONAL WORKSHOP, KEDLA 4.12 4.12 Yes Yes It should be Regional workshop, Tapin in place of Regional workshop, Kedla.
TAPIN(N) PROJECT 496.56 496.56 Yes Yes Area under approved existing PR of Tapin (N) OCP is 304 Ha. EPR of Tapin North OCP is under preparation at CMPDIL.
TAPIN(S) PROJECT 2144.91 2144.91 Yes No Land under approved PR boundary of Tapin South OCP is 261.03 Ha. Proposal for further utilization / land to be spared has been initiated vide e office no. E725918 in respect of remaining Land measuring 1878.37 Ha.

Annexure 2

Unit Name Unitwise Details of Land/ property
encroachment at Area (in Ha)
Action plan with timline against encroachment proposed by Area
CHAINPUR SIDING
CHARHI SIDING
GM OFFICE HAZARIBAGH
JHARKHAND COLLIERY
KEDLA OCP
KEDLA UGP
KEDLA WAHERY
Kotre Basantpur Pachmo Coal Mine
LAIYO COLLIERY
PAREJ EAST UG
PAREJ EAST OCP
PAREJ WEST OCP
REGIOANL STORE PAREJ
REGIONAL JUBILEE HOSPITAL, KEDLA
REGIONAL WORKSHOP, KEDLA
TAPIN(N) PROJECT
TAPIN(S) PROJECT